TGStat
TGStat
Введите текст для поиска
Расширенный поиск каналов
  • flag Russian
    Язык сайта
    flag Russian flag English flag Uzbek
  • Вход на сайт
  • Каталог
    Каталог каналов и чатов Региональные подборки Тематические подборки Платные каналы Поиск каналов
    Добавить канал/чат
  • Рейтинги
    Рейтинг каналов Рейтинг чатов Рейтинг публикаций
    Рейтинги брендов и персон
  • Аналитика
  • Поиск по публикациям
  • Мониторинг Telegram
  • Продвижение
    Реклама через Яндекс Бизнес Реклама в каналах через TGStat Agency Реклама на сайте TGStat.ru
Evrone

13 Aug, 12:32

Открыть в Telegram Поделиться Пожаловаться

How do you migrate dozens of services to a new infrastructure without taking down production?

In the Wayo* case study, we had one month to do it.
The task wasn't just about moving infrastructure from an old Kubernetes cluster to a new one. The services also had to be adapted to an updated internal engineering platform.

The most interesting part was the dependencies. Each service had its own set of configurations, databases, Redis and other KV stores, brokers, internal services, and external APIs. Moreover, some connections weren't obvious from the original configuration and were only discovered during analysis.

So for each service, we defined a unified preparation process and a set of readiness criteria: startup, health checks, accessibility within the cluster, connections to storage systems and APIs, logs, and key user scenarios.

In production, the old and new versions ran in parallel for some time. First we validated the new version, then switched traffic over to it, and only after a monitoring period did we decommission the old one. If something went wrong, we had the option to roll back.

By the end of the fourth week, all services scheduled for migration had been moved to the new platform and launched in the new cloud environment. The user-facing application continued running without interruption.

We covered the dependency audit, the migration process, and the traffic switchover in detail in our case study: https://evrone.com/cases/wayo 

And what stage of migration usually turns out to be the trickiest for you?

*The company name and certain identifying details have been changed because the project was completed under an NDA.

117 0 0 1 9
Каталог
Каталог каналов и чатов Подборки каналов Поиск каналов Добавить канал/чат
Рейтинги
Рейтинг каналов Telegram Рейтинг чатов Telegram Рейтинг публикаций Рейтинги брендов и персон
API
API статистики API поиска публикаций API Callback
Наши каналы
@TGStat @TGStat_Chat @telepulse @TGStatAPI
Почитать
Академия TGStat Исследование Telegram 2019 Исследование Telegram 2021 Исследование Telegram 2023
Контакты
Справочный центр Поддержка Почта Вакансии
Всякая всячина
Пользовательское соглашение Политика конфиденциальности Публичная оферта
Наши боты
@TGStat_Bot @SearcheeBot @TGAlertsBot @tg_analytics_bot @TGStatChatBot