TGStat
TGStat
Qidiruv uchun matnni kiriting
Ilg‘or kanal qidiruvi
  • flag Uzbek
    Sayt tili
    flag Russian flag English flag Uzbek
  • Saytga kirish
  • Katalog
    Kanal va guruhlar katalogi Hududiy to‘plamlar Tematik to‘plamlar Платные каналы Kanallar qidiruvi
    Kanal/guruh qo‘shish
  • Reytinglar
    Kanallar reytingi Guruhlar reytingi Postlar reytingi
    Brendlar va shaxslar reytingi
  • Analitika
  • Postlarda qidiruv
  • Telegram'ni kuzatish
  • Targ‘ibot
    Yandex Business orqali reklama TGStat Agency orqali kanallarda reklama TGStat.ru saytida reklama
Evrone

13 Aug, 12:32

Telegram'da ochish Ulashish Shikoyat qilish

How do you migrate dozens of services to a new infrastructure without taking down production?

In the Wayo* case study, we had one month to do it.
The task wasn't just about moving infrastructure from an old Kubernetes cluster to a new one. The services also had to be adapted to an updated internal engineering platform.

The most interesting part was the dependencies. Each service had its own set of configurations, databases, Redis and other KV stores, brokers, internal services, and external APIs. Moreover, some connections weren't obvious from the original configuration and were only discovered during analysis.

So for each service, we defined a unified preparation process and a set of readiness criteria: startup, health checks, accessibility within the cluster, connections to storage systems and APIs, logs, and key user scenarios.

In production, the old and new versions ran in parallel for some time. First we validated the new version, then switched traffic over to it, and only after a monitoring period did we decommission the old one. If something went wrong, we had the option to roll back.

By the end of the fourth week, all services scheduled for migration had been moved to the new platform and launched in the new cloud environment. The user-facing application continued running without interruption.

We covered the dependency audit, the migration process, and the traffic switchover in detail in our case study: https://evrone.com/cases/wayo 

And what stage of migration usually turns out to be the trickiest for you?

*The company name and certain identifying details have been changed because the project was completed under an NDA.

117 0 0 1 9
Katalog
Kanal va guruhlar katalogi Kanallar to‘plamlari Kanallar qidiruvi Kanal/guruh qo‘shish
Reytinglar
Telegram-kanallar reytingi Telegram-guruhlar reytingi Postlar reytingi Brendlar va shaxslar reytingi
API
Statistika API'si Postlar qidiruvi API'si API Callback
Kanallarimiz
@TGStat @TGStat_Chat @telepulse @TGStatAPI
O‘qish
Академия TGStat Telegram tadqiqoti 2019 Telegram tadqiqoti 2021 Telegram tadqiqoti 2023
Kontaktlar
Справочный центр Qo‘llab-quvvatlash Email Vakansiyalar
Har xil narsalar
Foydalanuvchi shartnomasi Maxfiylik siyosati Ommaviy oferta
Botlarimiz
@TGStat_Bot @SearcheeBot @TGAlertsBot @tg_analytics_bot @TGStatChatBot